Analysis Of Clean Water And Hot Water Needs Plumbing System In The Building

Authors

  • Bambang Jatmika Nusa Putra University
  • Irpan Maulana Nusa Putra University
  • Ridwan Al-Faqih Nusa Putra University
  • Reyland Aulia Zouda Nusa Putra University
  • Okost Maksim Viktorovich Rostov State Transport University

DOI:

https://doi.org/10.52005/ijeat.v4i2.51

Keywords:

Plumbing, Hot Water, Clean Water

Abstract

The plumbing system is an inseparable part of a multi-storey building. The plumbing system at the hotel is used to provide clean water and hot water needs. To meet the need for clean water in the design of an 8 floors building with a total of 45 inhabitants, an average number of 2,706 people per month and 100 visitors per day, a ground water tank capacity of 404.5 is required. m3 / and for the top water tank (Roof Tank) used a water reservoir of 21.59 m3. Based on the results of calculations for hot water needs where the toll of hot water needs per day is 12,900 liters including heat loss with 100% hotel occupancy and for heating time, it is obtained 9.79 hours / day using 2 units of heater heater 21.04 Kw

Downloads

Published

2021-11-29

How to Cite

Bambang Jatmika, Irpan Maulana, Ridwan Al-Faqih, Reyland Aulia Zouda, & Okost Maksim Viktorovich. (2021). Analysis Of Clean Water And Hot Water Needs Plumbing System In The Building. INTERNATIONAL JOURNAL ENGINEERING AND APPLIED TECHNOLOGY (IJEAT), 4(2), 64–78. https://doi.org/10.52005/ijeat.v4i2.51