Analysis and Identification of Factors Causing Flooding at Sukabumi City Terminal
DOI:
https://doi.org/10.52005/ijeat.v6i2.94Keywords:
Flood, Drainage, Terminal, SukabumiAbstract
The plumbing system is an inseparable part of a multi-storey building. The plumbing system at the hotel is used to provide clean water and hot water needs. To meet the need for clean water in the design of an 8 floors building with a total of 45 inhabitants, an average number of 2,706 people per month and 100 visitors per day, a ground water tank capacity of 404.5 is required. m3 / and for the top water tank (Roof Tank) used a water reservoir of 21.59 m3. Based on the results of calculations for hot water needs where the toll of hot water needs per day is 12,900 liters including heat loss with 100% hotel occupancy and for heating time, it is obtained 9.79 hours / day using 2 units of heater heater 21.04 Kw
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Utamy Sukmayu Saputrii, Ruli Maulana, Muhammad Hidayat, Dio Damas Permadi, Nita Kurnita Sari, Jeanne Sauce
This work is licensed under a Creative Commons Attribution 4.0 International License.